
Add to Cart
China Containerized Waste Water Treatment Systems Plant Manufacturer,Used In Schools, High-Speed Service Areas, Gas Stat
Product Description
1. It is suitable for the treatment of domestic sewage in communities, villages, campuses, hotels, etc.
2. The system is mainly composed of anaerobic system, aerobic system and deep aerobic system.
3. The anaerobic system is composed of anaerobic digester tanks, the aerobic system and the deep aerobic system are composed of aerobic digester tanks and aeration system.
4. Sewage is first treated by anaerobic system and then treated by aerobic system and deep aerobic system.
5. The biogas generated during the anaerobic treatment process can be collected, purified and stored for energy use, and it can also be discharged at a fixed point after deodorization.
6. The reclaimed water and a small amount of sludge after treatment can be used for greening.
Technical Parameters
Treatment capacity (m3 / h) | 0.5 | 1 | 3 | 5 | 10 | 20 | 30 | |
Blower | Model | CK-25 | CK-50 | CK-80 | CK-80 | CK-80 | CK-80 | CK-100 |
Power (kw) | 0.55 | 1.1 | 1.5 | 4 | 5.5 | 5.5X2 | ||
Power (kw) | 0.75 | 1.1 | 2.2 | 3 | ||||
Flow rate (m3 / h) | 0.5 | 1 | 3 | 5 | 10 | 20 | 30 | |
Lift (m) | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |
Equipment size | Length × width × height (m) | 3×1.5×2 | 4×1.5×2 | 6×2.5×2.75 | 10×2.5×2.75 | 14×2.7×3 | Customized split box | |
we can design different sizes according to different water capacity (m3 / h) |
product advantages
The equipment can be buried under the ground, and the upper part of the equipment can be used for greening or other purposes. There is no need for building houses, heating and thermal insulation.
It is fully automatic control, no need for personnel management, no sludge return, simple operation, convenient maintenance, low noise, no odor, and long service life.
It can be sprayed according to the color customers like.
Scope of Application
A. Wastewater treatment
B. Domestic sewage treatment and reuse
C. Organic industrial wastewater treatment: breeding, food, etc.
D. Treatment of landfill leachate, etc.
FAQ
Q1: Are you a trading company or a manufacturer?
We are manufacturer and have more than ten years of history.Our factory is located in zhengzhou,it takes only 40 minutes to go to the factory .Please feel free to visit our factory.
Q2: Can you customize product?
Sure,we have a professional design team,all products can be customized according to your requirements.
Q3: What’s your delivery time?
It’s based on order quantity.Normally, our production time is 15 to 30 working days.
Q4: How to install our product?
We will send you the installation pictures,videos for your reference.If you can’t install it by your side,we can dispatch engineer to your place to assist the installation.